Instant quote →
Two bathrooms & stacker door, Mannering Park

Bathrooms

Two bathrooms & stacker door.Mannering Park.

Drag to compare

BeforeAfterBEFOREAFTER

The problem

Two bathrooms to renovate — upstairs the bath, shower and vanity all had to move — plus a wall to open up for a big stacker door.

What we did

  • Downstairs bathroom renovated on slab with a new toilet and wall-hung vanity
  • Upstairs bathroom rebuilt on joists in a new layout with a freestanding bath
  • 19 m² wall stripped both sides and reframed with an LVL lintel
  • 2.1 × 3.2 m three-panel stacker door and wall wrap

The result

Two finished bathrooms and a wide-open wall to the outside.

Watch it

The build, start to finish

Walk through the finished job

Before

Finished

Want one like this?

Tell us about your bathrooms job. Our estimator Jarrad will book a free site measure.

CallInstant quote