Instant quote →
Bathroom, Toronto

Bathrooms

Bathroom.Toronto.

Final cost $25,000 inc GST16 days on site

Drag to compare

BeforeAfterBEFOREAFTER

The problem

An outdated bathroom with an old bath, tired tiles and a separate shower.

What we did

  • Full strip-out back to the frame; frame modified and blocked
  • Walls relined in Villaboard, ceiling in Aquachek
  • Waterproofing and screed
  • Floor and wall tiles — full height in the shower, with a niche and shower seat
  • New plumbing for shower, vanity, bath and toilet
  • Frameless screen, cornice and painting

The result

From outdated to a bright, modern bathroom with a freestanding bath and walk-in shower.

Watch it

The finished job
The build, start to finish

Walk through the finished job

Before

Finished

Want one like this?

Tell us about your bathrooms job. Our estimator Jarrad will book a free site measure.

CallInstant quote