
The problem
A sunroom with non-compliant floor joists, a dividing wall splitting kitchen from living, and a deck whose bearers, joists and piers all needed replacing.
What we did
- New joists, LVL bearers and insulated floor
- Dividing wall removed on a double LVL beam
- Two skylights and three glass doors across an 8.8 m wall
- Earthwool, plasterboard and square-set finish
- New deck: H4 posts, Scyon floor, flyover roof, stairs and glass balustrade
The result
One open kitchen and living space flowing out to a new covered deck.
Watch it
Finished





Design & buildConcept to handover, with our design partner Talyama.How it works →Instant quoteA price range in 2 minutes, from our real rates.Get my range →$500 referralGift card once their contract is signed and deposit paid.Refer a friend →
Koori Price Lock — any change in writing, with photos, approved by you before we do it. All offers →
Want one like this?
Tell us about your kitchens job. Our estimator Jarrad will book a free site measure.
